


Well the remolding cont.'s on. The mudroom was completely empty out including the paneling that was in there. Having removed it all now we know why it was really cold in the winter and really hot in the summer. There was no insulation in the walls at all and the ceiling had some but not a lot.
Now we have the electrical done in there with the help of Brent's dad. We all so went from 5 single pane windows to 2 big double pane windows. and we have all the insulation in the walls still need to complete the ceiling. It will be nice when we get it all done.